Skip to main content

View Basket

BUNDLEH37 Transport for Wales - Class 67 'Train & Coaches' Bundle

Multi-Buy
Out Of Stock
Item code:
BUNDLEH37

View Stockists
Hornby Brand
1:76 Scale 00 Gauge Item Scale

Product Info

Recreate the modern Welsh rail experience with this striking Transport for Wales bundle. Led by a powerful Class 67 locomotive—built by Alstom in Spain between 1999 and 2000—this set includes everything you need to bring high-speed regional travel to life on your layout.

As well as the Class 67 in Transport for Wales livery, this bundle features a full rake of Mk4 coaches and the Mk4 DVT No. 82229 in matching livery. Whether you're expanding a contemporary collection or starting fresh, this bundle delivers authenticity, detail, and visual impact in equal measure.

Looking to complete your Transport for Wales lineup? Purchase this bundle and save up to 40% off the RRP.

What's Included

Transport for Wales, Class 67, Bo-Bo, 67020 - Era 11

Product code: R30161

Class 67 locomotives are a class of Bo-Bo diesel-electric locomotives which were built for the English Welsh & Scottish Railway (EWS) between 1999 and 2000 by Alstom at Meinfesa in Valencia, Spain with drive components from General Motors' Electro-Motive Division, builders of the Class 66. The bodyshell is a monocoque load-bearing Alstom design, the bogies are an "H" frame Alstom design, the engine, traction motors and control electronics are GM-EMD products.

Unlike the Class 66, the traction motors are frame mounted rather than axle hung to reduce unsprung mass and the gear ratio is increased allowing higher speeds which reflect the locomotives' mixed traffic brief. The cab design has a central driving position. Initially, the class were used primarily on mail trains. In June 2003 EWS lost the Royal Mail mail train contract, with services diminishing to complete cessation in March 2004. The locomotives have since been used by First ScotRail on the Caledonian Sleeper on non-electrified lines north of Edinburgh. In April 2015, GB Railfreight commenced a contract to haul the Caledonian Sleeper with 67004 repainted and renamed for use on the service.

When GB Railfreight started to provide the trains and crews for the Serco franchise in 2015, it was planned to use rebuilt Class 73/9s. The first of these came into service in February 2016. The Class 67s continued to be used on some services for another couple of years. Class 67s are also used as Thunderbird rescue locomotives for failed trains on the East Coast Main Line, on some freight trains and for use on chartered tourist trains. Two locomotives were assigned to, and received special liveries for, use with the Royal Train from 2003, and a third had a commemorative jubilee livery applied for use with the Royal Train during the Diamond Jubilee of Elizabeth II in 2012.

No. 67020 entered service in 2000 with a standard EWS red and yellow livery. The Class 67 locomotive was transferred to DB Cargo UK from EWS ownership in 2007. In October 2022, 67020 was transferred to Transport for Wales on lease from DB Cargo UK. To haul the TfW Mk4 coach sets, 67020 was repainted into a hybrid DB/TfW black and red livery with TfW branding.

Our model of No. 67020 features a sleek black and striking red hybrid TfW livery that is pleasing to the eye. This locomotive will be perfect coupled with any of our TfW Mk4 passenger coaches to make a full rake. Each model is DCC-ready with a 21-pin socket.

Individual price: £214.99

Item Length - Without Packaging (cm)
25.9
Item Height - Without Packaging (cm)
5.9
Item Width - Without Packaging (cm)
11.2
Item Weight - Without Packaging (kg)
0.87
Item Scale
1:76 Scale 00 Gauge
DCC Status
DCC Ready 21 pin socket
Operator
Transport for Wales
Designer
Alstom
Wheel Configuration
Bo-Bo
Minimum Curve (mm)
Radius 2
Number of Parts
1
Class
Class 67
Buffer Type
Metal Sprung Buffers
Coupling Type
NEM Couplings
Hornby Decoder Compatibility Primary
HM7000-21TXS: Bluetooth® & DCC Sound Decoder (21-pin)

Transport for Wales, Mk4 Open First (Accessible Toilet), 11324 - Era 11

Product code: R40185

Built at Metro-Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired.


Mk4 coaches featured many improvements over the Mk3s such as push-button operated plug-type doors, fully sealed gangways and a designed top speed of 140mph. Much of the Mk4 design was based upon the Advanced Passenger Train. In particular, Mk4 coaches feature sides profiled to allow a tilt of up to 6° with newly fitted tilting bogies. Mk4s entered service in 1989 and helped drive a significant increase in passenger traffic. With privatisation in 1996, all Mk4 coaches were sold to Evershot Rail Group who have since leased them out to the holder of the InterCity East Coast Franchise.


The franchise was initially awarded to Great North Eastern Railway (GNER) and has since been operated by National Express East Coast, East Coast, Virgin Trains East Coast and London North Eastern Railway (LNER) owned by the Department for Transport. Between October 2003 and November 2005 Bombardier Transportation, under contract from GNER, commenced refurbishment of the Mk4 stock, fitting new seating arrangements and introduced onboard Wi-Fi, a first for British rail services. This refurbishment programme was called 'Project Mallard' named after the Mallard steam locomotive, built in the 1930s by the London & North Eastern Railway and holder of the world speed record for steam locomotives.


Although Mk4 coaches have spent most of their lives on the ECML, there are plans to cascade them down to other lines due to the introduction of the Class 800 and Class 801 IEPs.

Individual price: £49.99

Item Length - Without Packaging (cm)
33
Item Height - Without Packaging (cm)
5
Item Width - Without Packaging (cm)
3.5
Item Weight - Without Packaging (kg)
0.2
Item Scale
1:76 Scale 00 Gauge
License
No
Operator
Transport for Wales
Designer
Met Cam
Minimum Curve (mm)
Radius 2
Number of Parts
1

Transport for Wales, Mk4 Standard, 12447 - Era 11

Product code: R40187

Built at Metro-Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push-button operated plug-type doors, fully sealed gangways and a designed top speed of 140mph. Much of the Mk4 design was based upon the Advanced Passenger Train. In particular, Mk4 coaches feature sides profiled to allow a tilt of up to 6° with newly fitted tilting bogies.


Mk4s entered service in 1989 and helped drive a significant increase in passenger traffic. With privatisation in 1996, all Mk4 coaches were sold to Evershot Rail Group who have since leased them out to the holder of the InterCity East Coast Franchise. The franchise was initially awarded to Great North Eastern Railway (GNER) and has since been operated by National Express East Coast, East Coast, Virgin Trains East Coast and London North Eastern Railway (LNER) owned by the Department for Transport.


Between October 2003 and November 2005 Bombardier Transportation, under contract from GNER, commenced refurbishment of the Mk4 stock, fitting new seating arrangements and introduced onboard Wi-Fi, a first for British rail services. This refurbishment programme was called 'Project Mallard' named after the Mallard steam locomotive, built in the 1930s by the London & North Eastern Railway and holder of the world speed record for steam locomotives.


Although Mk4 coaches have spent most of their lives on the ECML, there are plans to cascade them down to other lines due to the introduction of the Class 800 and Class 801 IEPs.

Individual price: £49.99

Item Length - Without Packaging (cm)
33
Item Height - Without Packaging (cm)
5
Item Width - Without Packaging (cm)
3.5
Item Weight - Without Packaging (kg)
0.2
Item Scale
1:76 Scale 00 Gauge
License
No
Operator
Transport for Wales
Designer
Met Cam
Minimum Curve (mm)
Radius 2
Number of Parts
1

Transport for Wales, Mk4 Standard/Kitchen, 10328 - Era 11

Product code: R40189

Built at Metro-Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push-button operated plug-type doors, fully sealed gangways and a designed top speed of 140mph. Much of the Mk4 design was based upon the Advanced Passenger Train. In particular, Mk4 coaches feature sides profiled to allow a tilt of up to 6° with newly fitted tilting bogies.


Mk4s entered service in 1989 and helped drive a significant increase in passenger traffic. With privatisation in 1996, all Mk4 coaches were sold to Evershot Rail Group who have since leased them out to the holder of the InterCity East Coast Franchise. The franchise was initially awarded to Great North Eastern Railway (GNER) and has since been operated by National Express East Coast, East Coast, Virgin Trains East Coast and London North Eastern Railway (LNER) owned by the Department for Transport.


Between October 2003 and November 2005 Bombardier Transportation, under contract from GNER, commenced refurbishment of the Mk4 stock, fitting new seating arrangements and introduced onboard Wi-Fi, a first for British rail services. This refurbishment programme was called 'Project Mallard' named after the Mallard steam locomotive, built in the 1930s by the London & North Eastern Railway and holder of the world speed record for steam locomotives.


Although Mk4 coaches have spent most of their lives on the ECML, there are plans to cascade them down to other lines due to the introduction of the Class 800 and Class 801 IEPs.

Individual price: £49.99

Item Length - Without Packaging (cm)
33
Item Height - Without Packaging (cm)
5
Item Width - Without Packaging (cm)
3.5
Item Weight - Without Packaging (kg)
0.2
Item Scale
1:76 Scale 00 Gauge
License
No
Operator
Transport for Wales
Designer
Met Cam
Minimum Curve (mm)
Radius 2
Number of Parts
1

Transport for Wales, Mk4 DVT, 82229 - Era 11

Product code: R40190

Built at Metro-Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push-button operated plug-type doors, fully sealed gangways and a designed top speed of 140mph. Much of the Mk4 design was based upon the Advanced Passenger Train. In particular, Mk4 coaches feature sides profiled to allow a tilt of up to 6° with newly fitted tilting bogies.


Mk4s entered service in 1989 and helped drive a significant increase in passenger traffic. With privatisation in 1996, all Mk4 coaches were sold to Evershot Rail Group who have since leased them out to the holder of the InterCity East Coast Franchise. The franchise was initially awarded to Great North Eastern Railway (GNER) and has since been operated by National Express East Coast, East Coast, Virgin Trains East Coast and London North Eastern Railway (LNER) owned by the Department for Transport.


Between October 2003 and November 2005 Bombardier Transportation, under contract from GNER, commenced refurbishment of the Mk4 stock, fitting new seating arrangements and introduced onboard Wi-Fi, a first for British rail services. This refurbishment programme was called 'Project Mallard' named after the Mallard steam locomotive, built in the 1930s by the London & North Eastern Railway and holder of the world speed record for steam locomotives.


Although Mk4 coaches have spent most of their lives on the ECML, there are plans to cascade them down to other lines due to the introduction of the Class 800 and Class 801 IEPs.

Individual price: £94.99

Item Length - Without Packaging (cm)
25.4
Item Height - Without Packaging (cm)
5
Item Width - Without Packaging (cm)
3.5
Item Weight - Without Packaging (kg)
0.2
Item Scale
1:76 Scale 00 Gauge
License
No
Operator
Transport for Wales
Designer
Met Cam
Minimum Curve (mm)
Radius 2
Number of Parts
1

Transport for Wales, Mk4 Standard (End), 12219 - Era 11

Product code: R40194

Built at Metro-Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push-button operated plug-type doors, fully sealed gangways and a designed top speed of 140mph. Much of the Mk4 design was based upon the Advanced Passenger Train. In particular, Mk4 coaches feature sides profiled to allow a tilt of up to 6° with newly fitted tilting bogies.


Mk4s entered service in 1989 and helped drive a significant increase in passenger traffic. With privatisation in 1996, all Mk4 coaches were sold to Evershot Rail Group who have since leased them out to the holder of the InterCity East Coast Franchise. The franchise was initially awarded to Great North Eastern Railway (GNER) and has since been operated by National Express East Coast, East Coast, Virgin Trains East Coast and London North Eastern Railway (LNER) owned by the Department for Transport.


Between October 2003 and November 2005 Bombardier Transportation, under contract from GNER, commenced refurbishment of the Mk4 stock, fitting new seating arrangements and introduced onboard Wi-Fi, a first for British rail services. This refurbishment programme was called 'Project Mallard' named after the Mallard steam locomotive, built in the 1930s by the London & North Eastern Railway and holder of the world speed record for steam locomotives.


Although Mk4 coaches have spent most of their lives on the ECML, there are plans to cascade them down to other lines due to the introduction of the Class 800 and Class 801 IEPs.

Individual price: £49.99

Item Length - Without Packaging (cm)
33
Item Height - Without Packaging (cm)
5
Item Width - Without Packaging (cm)
3.5
Item Weight - Without Packaging (kg)
0.2
Item Scale
1:76 Scale 00 Gauge
License
No
Operator
Transport for Wales
Designer
Met Cam
Minimum Curve (mm)
Radius 2
Number of Parts
1

Recommended For You

People & Animals Accessory Bundle
People & Animals Accessory Bundle BUNDLEH30 | 1:76 Scale 00 Gauge
  • star - filled
  • star - filled
  • star - filled
  • star - filled
  • star - filled
(1) reviews
Hornby
Signal Accessory Bundle
Signal Accessory Bundle BUNDLEH28 | 1:76 Scale 00 Gauge
  • star - filled
  • star - filled
  • star - filled
  • star - filled
  • star - filled
(1) reviews
Hornby
R603 Long Straight - 24 Pack Bundle
R603 Long Straight - 24 Pack Bundle BUNDLEHR603 | 1:76 Scale 00 Gauge
  • star - filled
  • star - filled
  • star - filled
  • star - filled
  • star - filled
(1) reviews
Hornby

Tech Specs

Item Scale
1:76 Scale 00 Gauge
Operator
Transport for Wales

Reviews